-
Annual Operating Plan for Colorado River Reservoirs 2022
Each year’s Annual Operating Plan (AOP) for Colorado River Reservoirs reports on both the past operations of the Colorado River reservoirs for the completed water year as well... -
Lake Berryessa and Monticello Dam Daily Lake/Reservoir Elevation-ft Time Series Data
California Great Basin Region Water Operations Data for Lake Berryessa and Monticello Dam. -
March 2025 Most Probable 24-Month Study
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
Flaming Gorge Reservoir Dam and Powerplant Daily Lake/Reservoir Evaporation-af Time Series Data
Daily total lake/reservoir evaporation in acre-feet for Flaming Gorge Reservoir, Dam, and Powerplant. Data are typically updated once a day. -
American River At Rainbow Bridge Zinc ug/L Time Series Data
Measurements of Zinc collected at American River At Rainbow Bridge. Currently collected twice a year, previously collected quarterly. Access further information for this data... -
Lake Havasu Parker Dam and Powerplant Daily Lake/Reservoir Elevation-ft Time Series Data
Data are from the Lower Colorado Hydrologic Database and updated once daily. -
Minidoka Power Plant Unit 6 Monthly Power Plant Unit Gross Generation-kwH Timeseries Data
Values per Facilities, Instructions, Standards, and Techniques (FIST) Vol 1 - 2. Note: Data are reported at a monthly time step. Although values are dated as the first of each... -
August 2009 Most Probable 24-Month Study
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
Hoover Power Plant Unit N8 Monthly Power Plant Unit Gross Generation-kwH Timeseries Data
Values per Facilities, Instructions, Standards, and Techniques (FIST) Vol 1 - 2. Note: Data are reported at a monthly time step. Although values are dated as the first of each... -
American River At Head Waters Of Folsom South Canal Anthracene ug/L Time Series Data
Measurements of Anthracene collected at American River At Head Waters Of Folsom South Canal. Currently collected twice a year, previously collected quarterly. Access further... -
Columbia-Pacific Northwest Region Invasive Mussel Early Detection Sampling Geospatial Data
Geospatial sampling data for early detection of invasive dreissenid (quagga and zebra) mussels. Sampling locations and sampling dates are included. Geographic sampling locations... -
August 2025 Probable Minimum 24-Month Study
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
New Melones Lake Dam and Powerplant Daily Lake/Reservoir Inflow-cfs Time Series Data
California Great Basin Region Water Operations Data for New Melones Lake Dam and Powerplant. -
January 2021 Most Probable 24-Month Study
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
Technical Memorandum No. ENV-2023-007: Evaporation from Lake Powell: In-situ Monitoring between 2018 and 2021
This report presents hydrometeorological observations and estimates of reservoir evaporation from two monitoring locations at Lake Powell from November 2018 to December 2021. We... -
American River At Folsom Powerhouse Chloride ug/L Time Series Data
Measurements of Chloride collected at American River At Folsom Powerhouse. Currently collected twice a year, previously collected quarterly. Access further information for this... -
Brantley Lake and Dam daily Lake/Reservoir Release - Total cfs daily Time Series Data
Daily time series for modeled total outflow in cfs released from Brantley Lake. Results were modeled using the Pecos River Operations Model (PROM) for the purpose of the Pecos... -
February 2021 Probable Minimum 24-Month Study
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
August 2013 Probable Minimum 24-Month Study
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
January 2019 Probable Minimum 24-Month Study
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor...