-
Federal
Triton-C WEC Installation, Operations and Maintenance Plan (DDP)
Department of Energy —
This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and... -
Federal
Triton-C WEC Numerical and LCOE Content Models (DDP)
Department of Energy —
These are the Content Models for the Triton-C multi-mode point absorber WEC based on the Detailed System Design Package (DDP), including WEC Numerical and LCOE... -
Federal
Triton-C WEC Fabrication Plan (DDP)
Department of Energy —
This is the Fabrication Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed...