April 2025 Probable Maximum 24-Month Study
The Probable Maximum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
April 2025 Most Probable 24-Month Study
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
October 2010 Probable Minimum 24-Month Study
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
April 2011 Most Probable 24-Month Study
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
Annual Operating Plan for Colorado River Reservoirs 2022
Each year’s Annual Operating Plan (AOP) for Colorado River Reservoirs reports on both the past operations of the Colorado River reservoirs for the completed water year as well... -
March 2025 Most Probable 24-Month Study
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
August 2009 Most Probable 24-Month Study
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
August 2025 Probable Minimum 24-Month Study
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
January 2021 Most Probable 24-Month Study
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
Technical Memorandum No. ENV-2023-007: Evaporation from Lake Powell: In-situ Monitoring between 2018 and 2021
This report presents hydrometeorological observations and estimates of reservoir evaporation from two monitoring locations at Lake Powell from November 2018 to December 2021. We... -
February 2021 Probable Minimum 24-Month Study
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
August 2013 Probable Minimum 24-Month Study
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
January 2019 Probable Minimum 24-Month Study
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
Annual Operating Plan for Colorado River Reservoirs 2020
Each year’s Annual Operating Plan (AOP) for Colorado River Reservoirs reports on both the past operations of the Colorado River reservoirs for the completed water year as well... -
March 2021 Probable Maximum 24-Month Study
The Probable Maximum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
August 2025 Probable Maximum 24-Month Study
The Probable Maximum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
September 2000 Most Probable 24-Month Study
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
June 2005 Most Probable 24-Month Study
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
August 2019 Probable Minimum 24-Month Study
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor... -
April 2010 Most Probable 24-Month Study
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor...