{"@type": "dcat:Dataset", "DOI": "10.15473/1415571", "accessLevel": "public", "bureauCode": ["019:20"], "contactPoint": {"@type": "vcard:Contact", "fn": "Ken Rhinefrank", "hasEmail": "mailto:krhinefrank@columbiapwr.com"}, "dataQuality": true, "description": "Columbia Power LCOE (levelized cost of energy) Model for the Stingray H1 at the DOE Reference Site of Humboldt, CA. The model is integrated with and reports LCOE from DOE Cost Breakdown Structure", "distribution": [{"@type": "dcat:Distribution", "accessURL": "https://mhkdr.openei.org/files/194/DE-EE0007347%20M2.4%20H1%20LCOE%20Model%20PD%20v1.0%2003-06-2017.xlsx", "description": "Columbia Power's LCOE Model for the Stingray H1 at the DOE Reference Site of Humboldt, CA. The model is integrated with and reports LCOE from DOE's Cost Breakdown Structure", "format": "xlsx", "mediaType": "application/vnd.openxmlformats-officedocument.spreadsheetml.sheet", "title": "Stingray WEC LCOE Model Humboldt CA Reference Site.xlsx"}], "identifier": "https://data.openei.org/submissions/7877", "issued": "2017-03-06T07:00:00Z", "keyword": ["MHK", "Marine", "Hydrokinetic", "energy", "power", "Humboldt", "CA", "USA", "LCOE", "WEC", "wave energy", "Wave Energy Converter", "stingray", "H1", "cwpr", "wave", "levelized cost of energy", "Columbia Power Technologies", "point", "absorber", "economics", "cost", "point absorber buoy"], "landingPage": "https://mhkdr.openei.org/submissions/194", "license": "https://creativecommons.org/licenses/by/4.0/", "modified": "2022-03-06T07:00:02Z", "programCode": ["019:009"], "projectLead": "Alison LaBonte", "projectNumber": "EE0007347", "projectTitle": "Reduction of System Cost Characteristics Through Innovative Solutions to Installation, Operations, and Maintenance", "publisher": {"@type": "org:Organization", "name": "Columbia Power Technologies, Inc."}, "spatial": "{\"type\":\"Polygon\",\"coordinates\":[[[-124.91441508789,40.493126959856],[-124.07680874023,40.493126959856],[-124.07680874023,41.14288548653],[-124.91441508789,41.14288548653],[-124.91441508789,40.493126959856]]]}", "title": "StingRAY H1 Humboldt Cost Breakdown Structure"}