{"@type": "dcat:Dataset", "accessLevel": "public", "bureauCode": ["019:20"], "contactPoint": {"@type": "vcard:Contact", "fn": "Kate Stinson", "hasEmail": "mailto:stinson@oscillapower.com"}, "dataQuality": true, "description": "This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface float arrangement. This document details the IO&M and safety procedures for each system and subsystem in the Triton-C WEC.", "distribution": [{"@type": "dcat:Distribution", "accessURL": "https://mhkdr.openei.org/files/338/Triton-C%20Operations%20and%20Maintenance%20Plan%20R0-6%20%281%29.pdf", "description": "The Installation, Operations and Maintenance Plan for the Triton-C based on the detailed design package.", "format": "pdf", "mediaType": "application/pdf", "title": "Triton-C IOM Plan.pdf"}], "identifier": "https://data.openei.org/submissions/8557", "issued": "2020-11-02T07:00:00Z", "keyword": ["MHK", "Marine", "Hydrokinetic", "energy", "power", "wave energy", "Triton", "detailed design", "Operations", "Maintenance", "IOM", "IOM Plan", "reaction ring", "surface float", "power take off", "arrangement", "fabrication", "installation", "drivetrain", "gearbox", "tendon", "hull", "hull structure", "hydraulics", "OM", "field test", "Wave Energy Test Site", "WETS", "Oahu", "Hawaii", "safety", "mooring", "survivability", "reliability", "multi-mode", "point absorber buoy", "heave", "WEC", "Oscilla Power"], "landingPage": "https://mhkdr.openei.org/submissions/338", "license": "https://creativecommons.org/licenses/by/4.0/", "modified": "2025-11-03T07:00:06Z", "programCode": ["019:009"], "projectLead": "Bill McShane", "projectNumber": "EE0007819", "projectTitle": "Demonstration of an Advanced Multi-Mode Point Absorber for Wave Energy Conversion", "publisher": {"@type": "org:Organization", "name": "Oscilla Power, Inc."}, "spatial": "{\"type\":\"Polygon\",\"coordinates\":[[[-124.30879375,45.62959980117794],[-120.45269375,45.62959980117794],[-120.45269375,49.14884179274314],[-124.30879375,49.14884179274314],[-124.30879375,45.62959980117794]]]}", "title": "Triton-C WEC Installation, Operations and Maintenance Plan (DDP)"}