{"@type": "dcat:Dataset", "accessLevel": "public", "contactPoint": {"@type": "vcard:Contact", "fn": "mwofford_CAEnergy", "hasEmail": "mailto:gis@energy.ca.gov"}, "description": "<p><font size='3'>The EVSE Deployment and Grid Evaluation (EDGE) Tool\u00a0is\na mapping and visualization tool that provides the ability for users to assess\nthe feasibility of deploying charging infrastructure in the context of local\ngrid constraints.</font></p><p><font size='3'>EDGE\ninputs information from two sources:</font></p><p></p><ul><li><font size='3'><b>California Investor-Owned Utility (IOU) Grid Needs Assessment (GNA) datasets</b> - The GNA data provide information regarding the amount of &quot;headroom&quot;\nthat primary circuits and substations have to accommodate new load before\nrequiring attention, such as equipment upgrades. Notably, there is no\ninformation present regarding the secondary distribution system. The GNA\ndataset EDGE currently uses is forecasted through 2025.</font></li><li><font size='3'><b>Results from the\u00a0<a href='https://www.energy.ca.gov/data-reports/reports/electric-vehicle-charging-infrastructure-assessment-ab-2127' target='_blank' rel='nofollow ugc noopener noreferrer'>CEC's AB 2127 Assessment</a>\u00a0Infrastructure Models, EVI-Pro and HEVI-LOAD</b>\u00a0- Hourly load profiles from both models are combined and their overall peak values are assessed.</font></li></ul><div><font size='3'>The main result presented by EDGE is the capacity indicator metric (CIM), which is obtained by subtracting the peak EV charging load from the aggregated circuit capacity value for each TAZ throughout the state.</font></div><div><font size='3'><br /></font></div><div><i><font size='3'>Data last updated on 8/10/2023.</font></i></div><p></p><p><br /></p>", "distribution": [{"@type": "dcat:Distribution", "accessURL": "https://cecgis-caenergy.opendata.arcgis.com/datasets/CAEnergy::evse-deployment-and-grid-evaluation-edge", "format": "HTML", "title": "ArcGIS Hub Dataset"}, {"@type": "dcat:Distribution", "downloadURL": "https://services3.arcgis.com/bWPjFyq029ChCGur/arcgis/rest/services/EDGE_data_v1_6c/FeatureServer/27", "format": "ArcGIS GeoServices REST API", "mediaType": "application/octet-stream", "title": "ArcGIS GeoService"}, {"@type": "dcat:Distribution", "describedBy": "https://data.ca.gov/api/action/datastore_search?resource_id=61adfc7e-8270-40c2-a499-8073c11e9b49&limit=0", "describedByType": "application/json", "downloadURL": "https://cecgis-caenergy.opendata.arcgis.com/api/download/v1/items/b74a59787579447dbf287b1bbc938c2c/csv?layers=27", "format": "CSV", "mediaType": "text/csv", "title": "CSV"}, {"@type": "dcat:Distribution", "downloadURL": "https://cecgis-caenergy.opendata.arcgis.com/api/download/v1/items/b74a59787579447dbf287b1bbc938c2c/shapefile?layers=27", "format": "ZIP", "mediaType": "application/zip", "title": "Shapefile"}, {"@type": "dcat:Distribution", "downloadURL": "https://cecgis-caenergy.opendata.arcgis.com/api/download/v1/items/b74a59787579447dbf287b1bbc938c2c/geojson?layers=27", "format": "GeoJSON", "mediaType": "application/geo+json", "title": "GeoJSON"}, {"@type": "dcat:Distribution", "downloadURL": "https://cecgis-caenergy.opendata.arcgis.com/api/download/v1/items/b74a59787579447dbf287b1bbc938c2c/kml?layers=27", "format": "KML", "mediaType": "application/vnd.google-earth.kml+xml", "title": "KML"}], "identifier": "f9c4a90c-dcd3-4b3e-8723-28e2d9d72792", "issued": "2023-08-10T23:38:09.000Z", "keyword": ["CAOpenData", "California Energy Commission", "California Natural Resources Agency", "FTD", "california energy commission", "distribution circuit capacity", "electric vehicle charging"], "license": "http://www.opendefinition.org/licenses/cc-by", "modified": "2023-10-05T21:39:49.171Z", "publisher": {"@type": "org:Organization", "name": "California Energy Commission"}, "theme": ["Natural Resources"], "title": "EVSE Deployment and Grid Evaluation (EDGE)"}