The Challenge 2 Scoring Document PDF clarifies the terminology, scoring divisions, prize categories, and the use of transmission line and transformer switching. Transmission line and transformer switching may only be done in Divisions 3 and 4. No transmission line and transformer switching was allowed in Divisions 1 and 2.