-
Federal
February 2006 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
November 2011 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
April 2008 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
August 2019 Probable Maximum 24-Month Study
Department of the Interior —
The Probable Maximum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
February 2021 Probable Maximum 24-Month Study
Department of the Interior —
The Probable Maximum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
August 2016 Probable Minimum 24-Month Study
Department of the Interior —
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
January 2017 Probable Minimum 24-Month Study
Department of the Interior —
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
April 2017 Probable Minimum 24-Month Study
Department of the Interior —
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
Technical Memorandum ENV-2025-051: Upper Klamath River Basin Open Water Evaporation Modeling Report from the Klamath River Basin Revised Natural Flow Study
Department of the Interior —
This Technical Memorandum focuses on the development of daily open water evaporation rates and volumes from 13 lakes and reservoirs in the Klamath River Basin that... -
Federal
Technical Memorandum No. ENV-2025-074: Upper Klamath River Basin Surface Water Hydraulic Modeling Report from the Klamath River Basin Revised Natural Flow Study
Department of the Interior —
This report documents the hydraulic analyses conducted in support of the broader Klamath Natural Flow Study. Components of the hydraulic analyses needed for the... -
Federal
April 2019 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
January 2018 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
February 2001 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
June 2001 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
Modified multi-node well (MNW2) files used to model potential future (2016-2050) water-table elevation change near Kirtland Air Force Base in Albuquerque, New Mexico
Department of the Interior —
Data release to accompany the SIR: Modeling potential water-table elevation change as a result of projected pumping scenarios near Kirtland Air Force Base in... -
Federal
CM2.0 model: Projected shifts in fish species dominance in Wisconsin lakes under climate change
Department of the Interior —
Temperate lakes may contain both coolwater fish species such as walleye (Sander vitreus) and warmwater species such as largemouth bass (Micropterus salmoides). Recent... -
Federal
Ecological Model Support for the Western Everglades Restoration Project (WERP) Round One of Four, 2018
Department of the Interior —
Ecological models facilitate evaluation and assessment of alternative approaches to restore the Greater Everglades ecosystem. However, the provision of useful and... -
Federal
Pedestrian evacuation times for businesses on the islands of American Samoa, for 2009 and predicted maximum tsunami (PMT) inundation zones by village, modeled at four travel speeds (slow walk, fast walk, slow run, and fast run)
Department of the Interior —
This dataset contains American Samoa nonresidence count estimates as a function of travel time out of the 2009 and probable maximum tsunami (PMT) inundation zones for... -
Federal
Total monthly inorganic nitrogen deposition within watersheds draining to the Puget Sound and the Strait of Juan de Fuca, Washington, 2005 – 2020
Department of the Interior —
This data release contains monthly deposition estimates of wet and total inorganic nitrogen (reduced and oxidized) for watersheds draining to the Puget Sound and the... -
Federal
Russian River Integrated Hydrologic Model (RRIHM): Watershed PRISM Climate Data
Department of the Interior —
Monthly 30-year "normal" dataset covering the conterminous U.S., including the Russian River watershed, averaged over the climatological period 1981-2010. Contains...