-
Federal
November 2002 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
July 2008 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
October 2020 Probable Minimum 24-Month Study
Department of the Interior —
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
October 2014 Probable Minimum 24-Month Study
Department of the Interior —
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
January 2000 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
April 2021 Probable Maximum 24-Month Study
Department of the Interior —
The Probable Maximum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
Pecos River near Acme Monthly Number of Days Dry Time Series Data
Department of the Interior —
Monthly time series for modeled number of days Pecos River near Acme Gage is dry (<5cfs). Results were modeled using the Pecos River Operations Model (PROM) for... -
Federal
May 2022 Probable Minimum 24-Month Study
Department of the Interior —
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
January 2004 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
January 2013 Probable Maximum 24-Month Study
Department of the Interior —
The Probable Maximum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
January 2011 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
February 2000 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
May 2022 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
October 2015 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
February 2010 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
January 2019 Probable Maximum 24-Month Study
Department of the Interior —
The Probable Maximum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
December 2018 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
June 2025 Probable Minimum 24-Month Study
Department of the Interior —
The Probable Minimum 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming... -
Federal
September 2007 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
February 2025 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,...