-
Federal
Technical Memorandum ENV-2025-051: Upper Klamath River Basin Open Water Evaporation Modeling Report from the Klamath River Basin Revised Natural Flow Study
Department of the Interior —
This Technical Memorandum focuses on the development of daily open water evaporation rates and volumes from 13 lakes and reservoirs in the Klamath River Basin that... -
Federal
Technical Memorandum No. ENV-2025-074: Upper Klamath River Basin Surface Water Hydraulic Modeling Report from the Klamath River Basin Revised Natural Flow Study
Department of the Interior —
This report documents the hydraulic analyses conducted in support of the broader Klamath Natural Flow Study. Components of the hydraulic analyses needed for the... -
Federal
April 2019 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
January 2018 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
Fort Cobb Reservoir (Oklahoma) Sedimentation Survey Report 1993
Department of the Interior —
The Bureau of Reclamation conducted a survey at Fort Cobb Reservoir in March through April 1993. Survey data were used to update reservoir topography and compute the... -
Federal
February 2001 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,... -
Federal
June 2001 Most Probable 24-Month Study
Department of the Interior —
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge,...